A Battery Energy Storage System (BESS) is a large industrial facility made up of many oversized batteries connected to the electric grid.
Its basic purpose is to store electricity and send it back to the grid later.
Think of it as a warehouse full of giant rechargeable batteries.
What a BESS Is Used For
A BESS does two main things:
- Charges when electricity is cheap or plentiful
- Discharges power back to the grid when demand is high
BESS facilities are often built near solar or wind projects so excess energy can be stored instead of wasted.
What a BESS Facility Looks Like
Most BESS sites include:
- Rows of shipping-container-sized battery units
- Inverters and transformers
- Substation equipment
- Fencing and access roads
These are industrial sites that typically operate 24 hours a day and are often unmanned or very lightly staffed.
Why Developers Target Rural Areas
Developers often choose rural counties because:
- Land is cheaper
- Large parcels are easier to assemble
- High-voltage transmission lines already exist
- Zoning and land-use restrictions are limited
Rural communities become attractive mainly because they have space.
Construction Jobs vs. Long-Term Jobs
During Construction
- Temporary work lasting weeks or months
- Specialized crews usually brought in from outside the county
After Construction
Most BESS facilities require:
- Remote monitoring
- Occasional maintenance visits
- Typically 1โ3 permanent jobs, if any
These projects do not create a long-term employment base.
What Benefits Are Commonly Promised
Developers often claim BESS projects:
- Improve grid reliability
- Support renewable energy
- Provide economic development
What Communities Usually Experience
In practice, rural communities typically see:
- Very few permanent jobs
- Little local purchasing after construction
- Possible tax revenue only if the project is fully taxed
- No guarantee of improved local power reliability
If a project receives a tax abatement, much of the potential tax benefit is reduced or eliminated.
Related explainer:
๐ What Is a Tax Abatement?
๐ How County Taxes, the 3.5% Cap, and NNR Work in Texas
Fire and Safety Risks
Most BESS facilities use lithium-ion batteries.
These batteries can experience thermal runaway, a chain reaction where cells overheat and ignite.
When this occurs:
- Fires burn extremely hot
- Fires can last for hours or days
- Water may not stop the reaction
- Smoke can contain toxic chemicals
These are not ordinary structure fires.
What Strong Safety Planning Should Include
- On-site fire suppression systems
- Spacing between battery containers
- Automatic monitoring and shutdown
- Written coordination with local fire departments
Without these protections, nearby homes, pastureland, livestock, and first responders face increased risk.
Environmental Concerns
Potential issues include:
- Groundwater contamination after fires
- Runoff from suppression efforts
- Disposal of damaged or expired batteries
These impacts can affect surrounding land and water.
Noise and Daily Impacts
BESS sites can produce:
- Constant fan noise
- Electrical humming
- Occasional alarms
Noise may be low, but it is continuous.
Land Use and Property Impacts
- Industrial facilities change rural character
- Nearby property will become less desirable
- Agricultural use becomes harder
Once land is converted to industrial use, it rarely returns to farmland.
Planning and Oversight
Large industrial projects may fall under a Chapter 391 Planning Committee review process.
Related explainer:
๐ What Is a Chapter 391 Planning Committee?
Questions Residents Should Ask
- What fire suppression systems are on-site?
- What water source is required?
- What training will local fire departments receive?
- Who pays for emergency response costs?
- What happens when the batteries reach end-of-life?
- Is there a decommissioning bond?
Bottom Line
A BESS facility is a large industrial battery site.
It creates very few permanent jobs, offers limited local benefit, and introduces real safety and environmental risks.
Strong safety standards, full transparency, and full taxation should be in place before any approval.